| Location |
1-1-1 Wakihama Kaigandori, Chuo-ku, Kobe, Hyogo, Japan |
| Client |
Hyogo Prefectural Government |
| Design |
| Architect |
 |
Tadao Ando Architect & Associates |
| Structure |
Toshihiko Kimura Structural Engineers
Kanebako Structural Engineers |
| Equipment |
P.T. Morimura & Associate |
| Disaster prevention |
Ataka Fire Safety Design Office |
| Supervision |
Government Building Division and Public Building Equipment Division,
Urban Development and Housing Bureau Public Works and Development Department Hyogo Prefectural Government
Tadao Ando Architect & Associates |
|
| Contractors |
| Construction |
 |
Obayashi, Shimizu, Konoike, Shinko Kosan Construction,
Meiwa and Yamada Joint Venture |
| Electrical equipment |
Kurihara, Kandenko, Oda, Nikko and Hinomaru Joint Venture |
| Air-conditioning equipment |
Kawasaki, Toshiba, Nagamura, Kinki and Koryo Joint Venture |
| Plumbing equipment |
Ergotech, Kuni and Takai Joint Venture |
Electrical receivers and
transformers |
Kanden Kogyo |
| Elevators |
Fujitec |
| Gas service |
Osaka Gas Co. |
| Plantation |
Ishii Planting and Civil Engineering |
|
| Construction period |
March 1999 to September 2001
|
| Area and zone classification |
Urban planning area; neighborhood commercial zone;
and partial fire control zone |
| Main purpose of structure |
Art museum |
| Site area |
19,000.00 |
| Building area |
12,807.71 |
| Total floor area |
27,461.41 |
| Height |
23.1.m |
| Building coverage |
67.4% |
| Floor area ratio |
127.2% |
| Stories |
4 above ground and 1 underground |
| Structure |
Steel reinforced concrete structure (with seismic isolation) |
| Foundation ground |
Cast-in-place concrete steel piles
|
 |
1400
1600@
1600 with wider bottom
Base level 1 FL|19 m |
 |
8pcs.
15pcs.
198pcs. |
Cast-in-place concretel pile
|
800
Base level 1 FL|19 m |
8pcs. |
|
| Seismic isolation devices |
Rubber isolator
Steel damper @
Lead damper |
 |
190 units
173 units
76 units |
|
| Main exterior finish |
Floor
Walls
Roof |
 |
Flat concrete block flooring
Aluminum curtain wall, metallic panels and natural stone
Waterproof FRP with clerestories in some areas and canopies |
|
| Substation, Generator and Power Feeder |
Intake: 6,600 V 3 phase 3 wire ~ 2, 4,200 KVA Trans former capacity
Standby Generator: 500 KVA Gas turbine (6,600 V) 20,000L bulk tank |
| Electrical facilities |
Center monitoring system: 3,170 points (Substation, Lighting, HVAC, Plumbing)
| Low voltage system |
|
PA system, Electrical clock,
Interphone, Alarm system for HC, Restrooms, Master TV antenna, CATV, CCTV, Wire way for IT system, PABX, Parking lot system |
| Security system |
Passive sensor, Access control |
| Fire alarm system |
CRT monitoring system, 1.189 points analogue detector |
| Audio visual system |
|
Auditorium, Lecture room |
Photograph studio |
 |
Dimming system |
|
| HVAC system |
| Energy source |
 |
1) Domain cooling and heating, cooling 2,900 Kw and heating 1,500 Kw
2) Air-cooled ice thermal storage unit,700 Kw
(2 units,including a heat recovery type unit) |
| Air-conditioning |
Air-conditioner (50 units)
Chemical adsorption filters for storages and exhibition galleries
Sea salt resistant filters for outside air intakes |
| Ventilation and smoke exhaust |
Low pressure duct and four mechanically assisted smoke exhaust systems |
|
| Public health |
| Water supply |
 |
Potable water system-public water feeding from main water supply
(direct pressure water feeding system)
Graywater system: rain water feeding for flush toilets (pressurized water supply system) |
| Drainage |
Separated indoor drainage, combined outdoor drainage and pump subdrainage |
| Hot water supply |
Decentralized local supply system with electric water heater |
| Extinguish facilities |
Hose reel, sprinklers, foam system (parking lot) and nitrogen gas
extinguish system (central control room, storages and exhibition galleries) |
| Kitchen facilities |
Kitchens for restaurant and cafeteria |
|
| Elevators |
| Elevators |
 |
Freight elevators (3t)
Passenger elevators
Passenger and freight elevators |
@3
5
4 |
 |
12 elevators in total |
|
| Gas service |
| Gas |
|
Restaurant kitchen in the 2nd floor (city gas) |
|